Ft. Polk Roof Repairs
Multiple roofs were repaired during the course of this roofing project.
On building 850, we removed & replaced the TPO membrane roofing system in areas that were determined to be leaking across the 122,000 SF roof.
For building 3350, the work involved cleaning existing modified bitumen built- up roof system, repairing drains, and installing a closed cell spray foam roof and a silicone elastomeric membrane protective layer across the 40,446 sf roof.
During work on building 4147 & 4148, Ammo Magazine Bunker, we removed the earthen roof material, repaired the concrete structure where leaking, and installed a spray foam roof coating with a protective silicone membrane. When this was complete, our team replaced the earthen roof sand, soil, and sod, and installed a new drainage system affluent to the nearby field and blasted and painted the steel bunker doors.