Meridian Heavy Civil IDIQ

 
Justin J. Reeves, LLC now has three office location in the Southern United States

Our team performed multiple projects under this IDIQ. Some details below:

Runway Ground Clearing: Approximately 300 acres cleared near Joe Williams Field & McCain Field that significantly reduced BASH risk, reduced glide slope angle issues, reduced ground maintenance issues, and mitigated ATFP vulnerabilities.

Runway Drainage: Conducted drainage study to design positive drainage off and around runways.

Tree Removal: Cleared trees by main gate and left area suitable for mowers.

Chapel Culverts: Removed and replaced existing culvert and headwall system to allow proper inflow and drainage for 9.5 acres. Installed 72” RCPA across main road and installed new inflow and outflow headwalls. Graded surrounding areas to allow proper drainage to inflow headwall and installed rip rap dam system to allow proper erosion control.

Admin Erosion Control: Provided reshaping of various swales and graded elevations to promote storm water runoff erosion along drainage ditch and roadway. Installed filtration system consisting of sand and riprap at existing retention pond to allow water to permeate system and collect any sediment.