Cab Tower
Repairs and renovations to existing Tower Cab including elimination of rain water leaks into the cab by sealing and covering gaps in glazing, replacement of existing mansard roof. Repairs and renovations to covered walkway included roof replacement, ceiling replacement, fascia replacement, insulation and roof membrane replacement. Seal against water penetration all gutters, downspouts and vents.